Long Phu thermal power plant

  • Client: PVN
  • Project type: EPC & SC
  • Duration: 39 – 45 months
  • Key facilities: Long Phu thermal power plant with 1.200 MW capacity

Long Phu 1 Phoi canh 12.2009 sence 004